Inserail
  • Facebook
  • Linkedin
  • Twitter
    • Es
    • Cat
  • Home
  • Company
  • Areas of Activity
  • Services
  • Projects
  • R&D&I
  • News
  • Contact
  • Menu
Design

Inse Rail to optimize rail access to the new concessions of the Seville Port Authority

11 May, 2022

The Seville Port Authority has selected Inse Rail to draft the construction project for the railway accesses to the new terminals under concession on the Cuarto dock.

This project is being developed in parallel with the project for a new direct rail access to the Port of Seville that will speed up entry and exit by avoiding the reversal maneuver at the La Salud station. The project has already been opened for tenders by Adif.

This means that the layout is predefined by the Port Authority itself, but could undergo changes after the study of alternatives is completed. The approximate length is 2.5 kilometers and no structures are expected to be needed for the level crossings with the road network.

The works, with a completion time of six months, will involve, among other tasks, the collection of existing documentation, topography, geotechnics, analysis of existing services and facilities, identification of functional requirements, study of alternatives and drafting of a construction project to be executed entirely in the service area of the Seville port installations.

 

Source: Inse Rail  

May 11, 2022


https://inserail.lander-desarrollo.es/wp-content/uploads/2022/05/Inserail_puerto_de_sevilla.jpeg 680 1000 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-05-11 19:44:002022-05-16 09:38:56Inse Rail to optimize rail access to the new concessions of the Seville Port Authority
Design

Contract awarded for the works for the Inse Rail project to expand the Santa Catalina workshop

6 May, 2022

Renfe is expanding its Madrid high-speed train workshop to serve the incoming fleet. The works will start in June and account for 12.5 million euros out of a tendering budget of 16.5 million euros. The contract was awarded to the Seranco-Pasaval joint venture, with a completion time of nine months.

The Santa Catalina workshop, in the area of Entrevías and Puente de Vallecas, with a total of four tracks, began operating in 2010 with the opening of the Madrid-Valencia high-speed line. This number will now be doubled to serve a fleet with an additional 24 high-speed trains.

The project, which was drafted by Inse Rail, in consortium with Ofitep, provides the complete technical definition of all the works necessary for the commissioning of the new level-one workshop, and includes the railway infrastructure elements (track, electrification and safety and signaling installations), building elements and urban development elements (drainage, roads, connections, etc.), and all of the installations necessary for the complete operation of a maintenance complex of this type.

The expansion of the existing building, with four additional 200-meter tracks, will make it possible to service 48 vehicles at its eight maintenance stations. Renfe’s workshops are currently at 100% capacity, so the goal of the project is to increase the capacity of this facility, where the maintenance companies Actren and Nertus also work.

 
Source: Inse Rail 
May 6, 2022

https://inserail.lander-desarrollo.es/wp-content/uploads/2022/05/taller_Santa_Catalina_inserail.jpeg 680 1000 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-05-06 18:59:352022-05-16 09:25:47Contract awarded for the works for the Inse Rail project to expand the Santa Catalina workshop
Our Company

Inse Rail invited to participate in the opening ceremony of the Guadalmedina station of the Malaga metro

28 April, 2022

Last Friday afternoon, Juanma Moreno, president of the Junta de Andalucía, officially opened the Guadalmedina Metro station. The station, the largest in Andalusia, will not open for passengers until August or September. “We would love to see it full of people for the Feria de Málaga,” said the president.

He invited the companies involved in the works, along with the neighborhood associations affected by the project, to participate in the opening of the station. He was joined at the event by the Regional Minister of the Presidency, Elías Bendodo, the Regional Minister of Development, Marifrán Carazo, and the Mayor of Málaga, Francisco de la Torre, along with several members of the City Council.

He reiterated that the Metro is finished and is just awaiting the safety tests, which depend on the Railway Safety Agency and cannot be carried out sooner. Three things remain to be done, he explained: the completion of the safety tests, the museum display of the archaeological remains that can be visited free of charge right in the station and, most importantly, the arrival of the passengers.

Inse Rail was represented at the event by the company’s president, Cesar Cañedo-Argüelles, and the Director of the Industrial Area, Oscar Domingo, who is responsible for the execution of the contract signed last March with the Junta de Andalucía as part of a consortium with the company Betancourt Ingenieros, to coordinate the final works of the Malaga Metro for handover to the concessionaire and to supervise the start-up.

 
Source: Inse Rail 
April 22, 2022

https://inserail.lander-desarrollo.es/wp-content/uploads/2022/04/metro-malaga-inauguracion-Guadalmedina.jpeg 680 1000 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-04-28 23:10:002022-05-11 18:10:52Inse Rail invited to participate in the opening ceremony of the Guadalmedina station of the Malaga metro
Project Management

The 7th anniversary of the start of Inse Rail’s participation in the Haramain Line Project in Saudi Arabia

21 April, 2022

The Haramain Highspeed Railway (HHR) Line, which links the cities of Mecca and Medina, the destination of Islamic pilgrimages, began operations with its first trip in October 2018 and reached the milestone the first million passengers in February 2020.

In 2011, Al Shoula, a Spanish-Saudi consortium (made up of 12 Spanish and 2 Saudi companies) was awarded the contract to build and operate the Line. The scope of this major project included the construction and commissioning of two train maintenance workshops in the cities of Medina and Mecca.

Inse Rail, in consortium with TPF Getinsa, was the engineering company chosen by RENFE in 2014 to provide technical and contract consulting on all aspects related to the Medina and Mecca maintenance workshops.

Some the main tasks that Inse Rail has carried out over the years include all of the work related to a Project Management contract, such as the coordination of all of the project stakeholders in order to meet the defined objectives.

Over the course of these 7 years working on this emblematic railway project, our day-to-day work has consisted of defending of our Client’s interests in relation with its consortium partners, both from a technical and contractual point of view, identifying needs and preparing technical proposals for the works to be carried out, searching for subcontractors and suppliers, negotiating and drafting contract terms, working with our client on the bidding process, quality control of the awarded works with monitoring all of the project works and economic control of the project.

We would like to thank the entire Inse Rail team that has taken part, and that is currently participating in this outstanding project, providing a high level of professionalism, with significant personal and family sacrifice.

 

Source: Inse Rail
April 21, 2022

https://inserail.lander-desarrollo.es/wp-content/uploads/2022/04/inserail.-Haramain.jpeg 680 1000 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-04-21 22:47:552022-04-29 00:33:19The 7th anniversary of the start of Inse Rail's participation in the Haramain Line Project in Saudi Arabia
Design

Inse Rail to draft the project for the construction of a maintenance workshop for Adif Alta Velocidad locomotives and trains

10 April, 2022

This will be Adif and Adif Alta Velocidad’s first facility of this kind, and with it, the rail infrastructure manager aims to provide first-line maintenance of the twenty-two standard-gage locomotives and inspection trains that it has to carry out maintenance, examination and inspection work on the network.

The workshop will be built in Adif’s Madrid-Sur infrastructure maintenance sub-base and will be connected to the conventional line. It will also have the capacity to carry out the different maintenance operations on both standard and conventional-gage rolling stock.

Specifically, it will initially accommodate the twenty-two standard gage locomotives that Adif Alta Velocidad acquired in November 2019 to carry out examination, rescue, snowplowing or maintenance work support functions on high-speed lines.

However, the workshop will also be sized to handle the maintenance of the inspection trains and will be equipped with pits, longer bays and wheel turning equipment.

This new contract covers the analysis of the different options open to the Madrid Sur maintenance sub-base for building the workshop and connecting it to the conventional network, followed by the drafting of construction project.

 

Source: Vía Libre, La Revista del Ferrocarril
December 16, 2021

https://inserail.lander-desarrollo.es/wp-content/uploads/2022/04/taller_Adif_mantenimiento_inserail.jpeg 523 1000 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-04-10 21:38:252022-04-23 21:38:55Inse Rail to draft the project for the construction of a maintenance workshop for Adif Alta Velocidad locomotives and trains
Operation and Maintenance

Inse Rail signs a contract with AENA for Private Works Coordination Team services and planning for spaces dedicated to commercial activities.

28 March, 2022

The object of the services contracted by AENA covers all of the spaces dedicated to commercial activities (stores, restaurants, VIP lounges, parking lots, car rental or real estate assets), arising from the completion of contracts, airport remodeling, creation of new spaces or the obsolescence of the facilities in which these areas are located.

Inse Rail will provide the coordination, consulting, engineering, management and technical control services required to put these spaces into operation.

The contract scope covers the airports of the Autonomous Regions of Aragon, Catalonia, the Balearic Islands, Valencia, Murcia, Castilla la Mancha, Andalusia, Extremadura and the Autonomous Cities of Ceuta and Melilla.

 

Source: Inse Rail 
March 28, 2022

https://inserail.lander-desarrollo.es/wp-content/uploads/2022/03/ECOP_Aena_Inserail_0.jpeg 679 1002 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-03-28 21:26:282022-04-29 00:29:36Inse Rail signs a contract with AENA for Private Works Coordination Team services and planning for spaces dedicated to commercial activities.
Construction Engineering

Metro de Málaga awards Inse Rail, in consortium with Betancourt Ingenieros, the final contract to bring the metro to the Center.

14 March, 2022

The Junta de Andalucía has awarded the consortium the contract to coordinate handover of the final works to the concessionaire and the commissioning of the section from El Perchel to La Alameda.

The long-awaited arrival of the Malaga metro to the city center is quickly approaching. While it awaits the first cars that will soon run from El Perchel to Alameda Principal in the test phase, with the official opening expected next August, the Junta de Andalucía has just awarded the final pending contract: the coordination of the remaining works and the plan to integrate the section into the rest of the suburban network.

The joint venture formed by Inse Rail and Betancourt Ingenieros was awarded the contract for 1.3 million euros. The completion period is one year, although the Department of Public Works clarifies that this is “a maximum deadline and includes the warranty period, so it is neither indicative nor significant”.

The contract for ‘Technical assistance services to coordinate the works for the handover to the concessionaire and supervise commissioning’ of the central sections basically consists of verifying proper execution of the works, installations and railway signaling systems on the route, which runs under Callejones del Perchel and Avenida de Andalucía, ending at Alameda Principal.

This will be the last step to hand over the works to the operating company for the upcoming commissioning. It requires complying with the guarantee required by the concessionaire to ensure that the work that it will receive complies with all of the requirements.

 
Sorce: Diario Sur 
March 14, 2022

https://inserail.lander-desarrollo.es/wp-content/uploads/2022/03/metro_malaga_inserail.png 679 1000 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-03-14 21:48:352022-03-29 18:39:50Metro de Málaga awards Inse Rail, in consortium with Betancourt Ingenieros, the final contract to bring the metro to the Center.
R&D&I

Inse Rail joins TRUCKTREN

27 November, 2021

Inse Rail is joining TRUCKTREN, an ambitious, innovative project to develop a new system of sustainable and smart intermodal transport that moves trucks on light shuttles over Rolling Highways, guaranteeing traceability of goods, a virtual system of loading and unloading, and smart control of operations in logistics platforms.

TRUCKTREN is made up of Inse Rail, Gaptek, Airia, Salvat Logística, Carena and the technology center CEIT, which guarantees not only the highest levels of technological and technical excellence, but also the multifunctionality of its different work teams.


https://inserail.lander-desarrollo.es/wp-content/uploads/2021/11/trucktren_inserail.jpg 685 1001 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2021-11-27 22:51:212022-03-27 22:55:33Inse Rail joins TRUCKTREN
Design

Contract awarded to draft projects for the installation of falling object detectors in tunnels and overpasses

28 February, 2021

The business consortium made up of Inse Rail and Ines Ingenieros Consultores, will draft the projects for the adaptation of overpasses and tunnel entrances throughout the north railway network managed by ADIF, including conventional, standard and metric gauge lines, where the installation of protective enclosures is considered necessary for the later installation of the Falling Object Detection (DCO) system, as well as the inspection and inventory of these elements of the infrastructure.

The Falling Object Detection system, whose purpose is to prevent traffic incidents due to the possible invasion of the track gauge by foreign objects, is considered necessary to improve the operation of the lines, since it makes it possible to reliably confirm at all times that the track is free of obstacles at the points where the system is installed.

The most critical points in terms of the possibility of objects falling onto the track are tunnel openings, due to the need to control possible falling loose material, and overpasses, due to the possibility of objects falling from vehicle traffic travelling over them.

 

Source: Vía Libre, La Revista del Ferrocarril
February 24, 2021

https://inserail.lander-desarrollo.es/wp-content/uploads/2021/02/Proyectos-DCO-Inserail.jpg 720 1280 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2021-02-28 22:24:042021-03-02 22:22:45Contract awarded to draft projects for the installation of falling object detectors in tunnels and overpasses
Construction Engineering

The Airtren-Inse Rail consortium to provide the technical assistance for the works for the new Asfa Digital frequencies

5 February, 2021

Adif has contracted the Airten/Inse Rail consortium to provide the technical assistance for the supervision and control of the works for the broadcasting of the new Asfa Digital frequencies for stop pre-announcement, caution announcement and stop limit zone control aspects.

The project will improve safety by automating the indications and extending train control along the line. To do this, new type L5, L6 and double L7 digital balises, which enable Phase 2 functionality to the Asfa system as a whole, will be installed

Up to this point, in Phase 1, the stop pre-announcement and caution announcement indications are transmitted with thebalise on L1 together with the stop announcement indication at the Signal, requiring the train driver toselect in the onboard equipment the indication that corresponds to the aspect of the signal that they are going to pass andwill see.

To avoid errors and make driving more efficient, the new digital balises generate the frequenciesL5 and L6, automatically indicating the stop pre-announcement and caution announcement on-board without driver intervention,leaving L1 exclusively for the stop announcement indication. This is what is known asPhase 2 of Asfa operation.

 

Tools

The contracted consortium has proposed the use of the Daco software tool, an applicationdeveloped specifically for the technical assistance of installation projects. The tool is based on theSIFER application for inspection of railway technical installations and recording in a database, withgeoreferencing of photographs and associated documents, and is already used for the StateRailway Safety Agency.

In addition, the Asfa Tool train movement simulator will be used as a tool for design control,monitoring to ensure that the Asfa balises are correctly positioned on the line and that there are no “nesting” problems withother balises that could disturb the train speed control.

 

Source: Vía Libre, La Revista del ferrocarril
January 5, 2021

https://inserail.lander-desarrollo.es/wp-content/uploads/2021/02/Asfa_Digital.jpg 720 1280 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2021-02-05 21:14:122021-03-14 13:02:52The Airtren-Inse Rail consortium to provide the technical assistance for the works for the new Asfa Digital frequencies
Page 7 of 8«‹5678›

Categories

  • Uncategorized
  • Our Company
  • R&D&I
  • Consulting
  • Design
  • Construction Engineering
  • Operation and Maintenance
  • Project Management

Inse Rail

The company
R+D+I
Work with us

Catalá | Español

Activities

Railway Systems
Transport Infrastructure
Energy and Industrial Installations
Innovation

Offices

Madrid (Central)
Barcelona
Portugal
Saudi Arabia

Recent projects

Diagonal tram extension. (Barcelona)


https://inserail.lander-desarrollo.es/wp-content/uploads/2023/10/tranvia_diagonal1_inserail.jpeg 900 1200 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2023-10-22 12:36:522023-10-22 21:08:05Diagonal tram extension. (Barcelona)

Services to coordinate the Metro de Málaga works for handover to the concessionaire and commissioning supervision


https://inserail.lander-desarrollo.es/wp-content/uploads/2022/04/metro-malaga_inserail.png 420 728 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-10-17 12:11:082022-10-30 11:33:09Services to coordinate the Metro de Málaga works for handover to the concessionaire and commissioning supervision

© Copyright INSE RAIL S.L. | Avenida de Burgos, 12 – 7th Floor 28036 Madrid | T. +34 91 302 95 40

Disclaimer  |  Privacy Policy | Cookie Policy

Scroll to top