Inse Rail to supervise the works to extend siding tracks to 750 meters in three stations in Córdoba
These actions are aimed at achieving the conformity of the stations and to allow the parking and crossing of trains up to 750 meters long.
This author has yet to write their bio.Meanwhile lets just say that we are proud Jaime Cañedo contributed a whooping 235 entries.
These actions are aimed at achieving the conformity of the stations and to allow the parking and crossing of trains up to 750 meters long.
This action is aimed at upgrading and optimizing one of the region’s most important railway lines, which will improve the capacity, efficiency and reliability of the route to the benefit of both passengers and freight transport
“Robla Green” will be one of the largest renewable methanol plants in Europe
The president of the Senate presented Inserail’s president, César Cañedo-Argüelles with the Ad Honorem Mention for Professional Career, for his 59 years an engineer and businessman in the engineering sector.
Its main advantages are time and cost savings to define clearances, more reliable calculations and integration with other 3D modeling programs and the BIM ecosystem in general
The work consists of adapting the railway loading gauge of tunnels and overpasses to the dimensions required for the semi-trailers that will use the RH service between Madrid and Zaragoza
The project’s goal is to generate a new acoustic surveying methodology to assess the dynamic performance characteristics of masonry structures to make it possible to maintain stonework or brickwork railway structures
All the disconnect switches in the network’s catenary will be replaced, and they will also be integrated into a remote control system so that the devices can be monitored and controlled automatically
Alstom will build its first railway maintenance workshop at the factory in Santa Perpètua de Mogoda (Barcelona), which is approaching saturation and needs to be expanded and transformed.
The construction project for the remodel was designed by Inse Rail to expand the functionality and operation of the station’s layout to improve traffic performance and improve operating efficiency
© Copyright INSE RAIL S.L. | Avenida de Burgos, 12 – 7th Floor 28036 Madrid | T. +34 91 302 95 40

Diagonal tram extension. (Barcelona)
Services to coordinate the Metro de Málaga works for handover to the concessionaire and commissioning supervision